BECKTON OUTFALL

About This Project

Beckton 380 metre long 2.6m dia Twin Outfall.

LOCATION

Beckton River Thames

CONSTRUCTION DETAIL

  • Design outfall, temporary and permanent works.
  • Fabricate 2.6m diameter strings in various lengths.
  • Installation of 380 metre long twin wall cofferdam
  • Excavation and preparation of engineered bed
  • Installation of the Twin pipes include including insitu concrete ballast blocks.
  • Backfill with engineered surround and topped off with as dug material.
  • Extraction and removal of the sheet piled cofferdam

CLIENT

  • MVB & Thames Water

VALUE

  • £15 million pounds