HOLYHEAD FOOTBRIDGE RIVER CROSSING

About This Project

CMP were contracted to install rock-socketed piles to support Holyhead footbridge.

Works Description

Phase 1

  • Mobilise and position the General Zee jack-up barge
  • Drive casing tubes into rock from jack-up barge
  • Drill socket through casing tubes and clean out debris
  • Install steel reinforcement structures within casing tubes
  • Fill casing with concrete
  • Install pre-cast concrete crossheads on top of piles
  • Place and install pre-cast concrete decking beams

Phase 2

  • Continuation of rock-socketed foundation piling works from phase 1 but completed from the shore rather than the jack-up barge
Project

Holyhead Footbridge River Crossing

Location

Holyhead, Isle of Anglesey

Client

Laing O'Rourke

Value

£ 800,000

Date
Category
Coastal, Marine, Piling, Rock Socketed Pile Installation