NUSTAR Jetty 1 and 2 Dolphin Piling

About This Project

A refurbishment was required to the existing facility located on the river Thames for the Nustar Terminal. This work involved the following:-

Removal of old fender structures

Installation of new piled Breasting and Mooring Dolphins with all associated deck furniture

Installation of interconnecting walkways

Foundation frames for loading arms

Installation of task lights and Navigation lights.

Utilising both Jack Up barges and floating plant the Piles were successfully installed on time and to budget. CMP Thames’ experianced marine operatives and management team ensured the highest quality was acheived on site, Health and safety of other users and our own workforce was maintained to the highest standard.

 

 