Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in D:\HostingSpaces\CMPThames\cmp-thames.com\wwwroot\wp-content\plugins\revslider\includes\operations.class.php on line 2734

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in D:\HostingSpaces\CMPThames\cmp-thames.com\wwwroot\wp-content\plugins\revslider\includes\operations.class.php on line 2738

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in D:\HostingSpaces\CMPThames\cmp-thames.com\wwwroot\wp-content\plugins\revslider\includes\output.class.php on line 3679
CMP-Thames Ltd | NUSTAR Jetty 1 and 2
CMP-Thames Ltd | NUSTAR Jetty 1 and 2
16911
post-template-default,single,single-post,postid-16911,single-format-standard,ajax_fade,page_not_loaded,,side_area_uncovered_from_content,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-5.0.1,vc_responsive

NUSTAR Jetty 1 and 2

NUSTAR Jetty 1 and 2

A refurbishment was required to the existing facility located on the river Thames for the Nustar Terminal. This project involved the following:-

Removal of old fender structures

Installation of new piled Breasting and Mooring Dolphins with all associated deck furniture

Installation of interconnecting walkways

Foundation frames for loading arms

Installation of task lights and Navigation lights.

Utilising both Jack Up barges and floating plant the Piles were successfully installed on time and to budget. CMP Thames’ experienced marine operatives and management team ensured the highest quality was achieved on site, Health and safety of other users and our own workforce was maintained to the highest standard.

 

 