CMP-Thames Ltd | Navigator Terminal Up River Dolphin
16908
post-template-default,single,single-post,postid-16908,single-format-standard,ajax_fade,page_not_loaded,,side_area_uncovered_from_content,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-5.0.1,vc_responsive

Navigator Terminal Up River Dolphin

Navigator Terminal Up River Dolphin

Project Nears Completion!

A Design and build contract is currently being actioned on site.

After Design was undertaken led by our in house Design teams. The supply and installation of a new a new Piled Dolphin structure has been undertaken during 24 hour possessions of the terminal.

The project was undertaken with the use of a 400t Jack Up manned by our in house specialists.

 

 

No Comments

Post A Comment